The new goods contain a collection of substantial-tech and higher quality chains and sprockAdhering to “Survival by Quality, Development by Technologies & Credit score”, The organization will continually enhance item overall performance to meet up with the escalating customer demands in the demanding style of work. ets and gears, these kinds of as chains and gearboxes for agricultural machineries, metallurgical chains, escalator step-chains, large-speed tooth chains, timing chains, self-lubrication chains, amid which have kind large speed tooth chain for automobile department dynamic box and aerial chains fill in the blanks of chain in China.
Components |
one. metallic:Aluminum/Steel/Alloy steel/Stainless steel/Brass,copper,bronze and so on. two. plastic: Stomach muscles,POM,PE,PP,PVC,Pc,PMMA,Teflon,nylon etc. 3. others: carbon fiber, glass,fiberglass, wooden, challenging rubber and many others. |
Coloration |
Silver, Grey, Black ,Gold or as client’s requirement |
Area Roughness |
Ra0.8 ( without polishing or grinding) |
Logo Strategy |
laser engraving, CNC engraving, display-printing and so forth. |
Area Finish |
Anodize sharpening zinc/nickel/chrome/gold plating, sand blasting, ect. |
Tolerance |
+/- .01–.05mm / can also be tailored |
Certificate |
ISO SEPG |
Processing equipments |
CNC machining center,NC lathe, Grinding machine, Computerized lathe equipment, Standard lathe equipment,Milling device,Drilling device,EDM,Wire-cutting machine,CNC bending equipment etc |
Testing device |
Coordinate measuring device,Graphic measuring instrument,Caliper and so forth |
Software |
Health-related Instruments/Digital/ Industrial// Automation / motorcycle/3D printer |
Support |
OEM,ODM or as client’s prerequisite |
Packaging & Delivery
Packaging Information
1. inner packaging: plastic wrap, bubble bag, PE foam, EPE cotton,PP bag etc.
two. outer packaging: carton box, wood scenario, plate etc.
three. as for every customers’ prerequisite
Port
xiamen, or as client’s need
Lead Time :
Quantity(Items) | 1 – 20 | 21 – 100 | 101 – 1000 | >1000 |
Est. Time(days) | 5 | 10 | 25 | To be negotiated |
Trade Conditions | FOB, CIF, EXW |
MOQ | 1Pcs |
Port | xiamen, or as client’s requirement |
Shipping and delivery | By air (DHL,UPS,Fedex,EMS etc.),By Sea,Express… |
Payment Strategy | T/T(bank transfer),L/C,paypal,western union, moneygram,escrow, cash and many others |
Payment Conditions | fifty% ahead of manufacturing, 50% ahead of shipping and delivery |
Packing | interior box,several bins/learn carton or as customer’s need |
Shipping time | 5-7days for Alanple time,5-25 days for manufacturing |